Formal Risk Assessment and Job Safety Analysis
Activity/Task Title: Electrical and Instrunmentation work (Cable Pulling, Terminations, Piping Modification,Cable tray work,Support welding )
Plant and Department: U&O
Project Title: To install C20+ truck loading facility in united U&O
Job Steps & Sub Tasks
Lifting and positining of Cable drum & cable stand.
Installation of new breaker in substation & Cable termination and Card installation,DCS Configuration in RIB.
Cable Pulling.
Mobilization (Cable Materials, cable drum and Equipment’s by using crane,focklift,boom truck & dump truck)
Termination of power & control cables in control panels & JB’s and in RIB.
Support welding activity
Job steps s#
HAZARD
Initial/raw risk
Control measures
Residual Risk
Consequences
Likelihood
Risk
Consequences
1. Mobilization (Cable Materials,
cable drum and Equipment’s by
using crane,focklift,boom truck &
drum truck)
Dismantling & removal of existing Panels JB’s and conduits & installation of new JB's,transformers and heat tracing equipments.
Cable splicing, cad welding, Heat shrinking by Heat gun or gas torch.
Cable lugging and termination.
Installing cable Trays/conduits & Tubes, threading and bending, Drilling and knock out.
1. Ensure to comply with SHEM-08.06 lifting procedure. Enroute area shall be inspected
prior to mobilizing (unsafe ground condition).
2. Ensure to obtain a vehicle entry certificate, approved basic/critical lifting certificate
(SHEM 08.06) and work permit for crane lifting ,Boom truck & forklift activity prior to
entry into the job site.
3. Ensure proper distance between equipment (congested area, other activities).
4. Follow the UNITED traffic rules and regulations.
5. Follow equipment route map as per vehicle movement certificate.
6. Conduct gas test to ensure 0% LEL.
C3
L4
Minor
2.Damage to the vehicles, plant facilities
and equipment.
C3
L3
Significant
Insignificant
1. Un-inspected, uncertified rigging tools
and tackles Crane / incompetent
personnel that could lead to personal
injury.
C4
Minor
L3
1.Obtain valid work permit and vehicle entry certificate for the task.
2. Ensure that Crane,Forklift & truck must be inspected by UNITED mobile equipment &
must have a valid inspection sticker.
3. Only UNITED authorized crane & forklift operator, riggers, flag man (rigger) are
allowed to perform their job.
4. All lifting tools and tackles should be inspected and current color coded by UNITED
mobile equipment.
C4
L4
1. Fall of suspended load that could lead
to property damage and personal injury.
C3
L3
Significant
1. Gas test shall be conducted to ensure 0% LEL.
2. Combustible/flammable materials should be removed from the area.
3. While refueling vehicle engine should be shut down, no Hot work activity shall be
allowed nearby area.
4. Cover all sewer lines by using fire blanket on the radius of 3 meters.
5. Fire extinguisher should be placed near the crane.
6. Grounding cable should be connected at proper grounding point.
C3
L4
Minor
3. Heat coming from Internal
combustible engine that could cause fire.
C3
L3
Significant
1. Lifting area should be barricaded with proper sign board. No personnel are allowed
to walk, stand or work under suspended load. Rigging Supervisor shall conduct tool box
talk to workers and explain jsa/work permit.
2. Rigger should be visible to the crane operator/enough riggers should be provided.
3. Lifting tools and tackles shall be verified by authorized rigger. Softners shall be
provided for slings wound around sharp edges.
4. Only authorized person by riggers shall be allowed to enter inside the barricaded
area.
5. Lifting shall be performed as per approved lifting certificate.
6. Proper planning and supervision by related supervisor at all the time.
C3
L4
Minor
2. Lifting and positining of Cable
drum & cable stand.
Cable Meggering and Instrument loop checking.
1. Fall of suspended load that could lead
to property damage and personal injury.
C3
L3
Significant
1. Lifting area should be barricaded with proper sign board. No personnel are allowed
to walk, stand or work under suspended load. Rigging Supervisor shall conduct tool box
talk to workers and explain jsa/work permit.
2. Rigger should be visible to the crane operator/enough riggers should be provided.
3. Lifting tools and tackles shall be verified by authorized rigger. Softners shall be
provided for slings wound around sharp edges.
4. Only authorized person by riggers shall be allowed to enter inside the barricaded
area.
5. Lifting shall be performed as per approved lifting certificate.
6. Proper planning and supervision by related supervisor at all the time.
C3
L4
Minor
2. Lifting and positining of Cable
drum & cable stand.
1. Avoid lifting during wind speed >32Km/hr.
2. Avoid lifting during bad weather conditions (Rain/Fog/dust storm). Provide adequate
lighting for night time. Ensure lights not reflecting eyes of rigger / crane operator.
C3
L3
Significant
C3
L4
Minor
2. Lifting and positining of Cable
drum & cable stand.
4.Swinging load / Hitting rigger/Assets /
equipments/facility.
C3
L3
Significant
1. Rigger shall not stay in line of fire or shall come under suspended load. Use tag lines
to control movement of load.
2. The rigger shall ensure the load is rigged properly consider the centre of gravity and
use tag lines to control unexpected movement of load.
3. Rigger shall stay away from line of fire.
C3
L4
Minor
3. Congested area and pinch point that
can cause personal injury/slip,trip and
fall
C4
L3
Minor
1. Always wear PPE ( hand gloves, goggles) at all times while doing rigging.
2. Keep away your hand from pinch point.
3. Rigger should always stand to safe side where the crane operator can directly see.
C4
L4
Insignificant
2. High wind speed/ bad weather
conditions that could cause property
damage and personal injury.
3. Cable Meggering and Instrument
loop checking.
1. Obtain valid permkit for the task.
2. Barricade area, place wiith warning signs.
3. Use insulated tools. Make sure free end of cable is insulated to ensure no one
touches it.
4. Discharge current after test, confirm with multimeter.
5. Use of calibrated multimeter & hart communicater for loop check.
C4
L4
Insignificant
1. Electrical Shock
C4
L3
Minor
1. Use proper PPE, insulated low voltage eltectrical gloves shall be used.
C4
L4
Insignificant
2. Cuts, personal injury.
C4
L3
Minor
1. Use leather gloves Give enough rest breaks to workers , provide cool drinking water
and juice to workers.Do not strain back muscles.
C4
L4
Insignificant
Insignificant
1. Falling cable drum.
C4
L3
Minor
2. Personnel injury,ergonomical
hazards,heat stress.
C4
L3
Minor
3. Falling from heights (Personnel ,cable )
C4
L3
Minor
1. Use full body harness, If needed to extend body part out of handrails or unprotected
edges with scaffolding tag yellow.
2. Ensure scaffolding having valid inspection tag. ( If scaffolding is tagged green,Full
body harness is not required).
3. Always maintain three point contact.
C4
L4
1. Place cable drum on level ground.
2. Apply proper lubricant on rotating point of drum for smooth running.
3. Barricade work area place warning signs.
C4
L4
Insignificant
2. Electrocution & Pinch point.
3.Slip,Trip,Fall.
1. Wrong installation of breakers.
C4
C4
C4
L3
L3
L3
Minor
Minor
1. Use of proper PPE ( low voltage electrical gloves).
2. Keep your hands away from pinch points.
3. Make sure all the tools should be insulated.
4.Secure tools and nut bolts properly to prevent fall or contact with live systems.
Minor
1. Maintain good housekeeping all the time and watch your steps.
1.Obtain valid and proper work permit for the task.
2. Only allow competent electrician/person for the task.
3.All the cable termination and breaker installation by the presence of UNITED
authorised person.
4. Make sure the breakers are installing asper the drawing.
5. All the RIB configuration shall be done by authorized person.
C4
C4
C4
L3
L4
L4
Insignificant
Insignificant
Insignificant
4. Installation of new breakers in
substation & Cable termination,
Card installation,DCS Configuration
in RIB.
5. Cable Pulling.
Insignificant
3. Falling from heights (Personnel ,cable )
C4
L3
Minor
1. Use full body harness, If needed to extend body part out of handrails or unprotected
edges with scaffolding tag yellow.
2. Ensure scaffolding having valid inspection tag. ( If scaffolding is tagged green,Full
body harness is not required).
3. Always maintain three point contact.
C4
L4
L3
4. Damage to insulation cable.
C4
L3
Minor
1. Use roller for pulling cables to prevent damage.
2. Ensure cables don’t strike scaffolding parts while pulling.
C4
L4
Insignificant
L4
Insignificant
3. Slips, trips, & falls.
C4
L3
Minor
1. Keep walkways clear of tools and cables. Post warning signs,Barricade area.
2. Personnel injury & ergonomical
hazards
C4
L3
Minor
1. Use safety goggles,electrical gloves.
2. Avoid awkward movements.
C4
L4
Insignificant
Significant
1. Confirm LOTO, Confirm panels and MCC’s are grounded. Use multimeters to Check
for current. Use insulated tools.
2. Do not carry or wear any metal objects such as rings, watches, chains etc.
3. Confirm panels & JB’s are grounded before beginning work.
4. Make sure multimeters are calibrated.
C3
L4
Minor
1. Electric shock
L4
Insignificant
1. Wrong Panel & Conduits removals
C4
L3
Minor
2. Personal injury
C4
L3
Minor
L4
Insignificant
3. Damage to plant property & assets.
C4
L3
Minor
1. Make sure of shape, weight and size of new JB’s and panels & Conduits before
installation.
2. Use proper lifting and handling techniques to avoid damage to equipment.
1. Use leather gloves, proper PPE.
2. Use proper tools for the job & Inspect tools for damage before use.
C4
L4
Insignificant
L3
Minor
2. Dropping tools and
Materials.
C4
L3
Minor
3. Slips, trips, & falls, Pinch point
,Possibilty of entaglement, Awkward
movement, cut injury,
C4
L3
Minor
L4
Insignificant
1. Ensure scaffolding plat form is free from tools and materials. make sure toe boards
are installed on scaffolding.
2. Secure all tools with nylon rope, before using on heights. Lift material and tools using
baskets and securing with rope.
C4
L4
Insignificant
1. Use full body harness, If needed to extend body part out of handrails or unprotected
edges with scaffolding tag yellow.
2. Ensure scaffolding having valid inspection tag. ( If scaffolding is tagged green,Full
body harness is not required).
3. Always maintain three point contact. while ascending or descending ladder.
C4
L4
Insignificant
1. Maintain good housekeeping all the time and watch your steps.
2. Keep your hands away from rotaing parts.
3. Do not wear loose clothings.
4. Maintain good working posture to avoid ergonomic hazards.
5. Make sure all the power tools should be inspected by UNITED and inspection sticker
on it.
5. Use proper PPE.
C4
C4
1. Make sure, double check and reconfirm from site engineer and mark the panels and
conduits to be removed.
C4
C4
5. Cable Pulling.
6. Termination of power & control
cables in control panels & JB’s, and
in RIB.
7. Dismantling & removal of
existing Panels JB’s and conduits &
installation of
newJB's,transformers and heat
tracing equipments.
8. Installing cable Trays/conduits &
Tubes, conduit threading &
Bending, Drilling and knock out.
1. Working at heights
Falling from heights.
C4
C3
3. Slips, trips, & falls, Pinch point
,Possibilty of entaglement, Awkward
movement, cut injury,
C4
L3
Minor
L4
Insignificant
1. Maintain good housekeeping all the time and watch your steps.
2. Keep your hands away from rotaing parts.
3. Do not wear loose clothings.
4. Maintain good working posture to avoid ergonomic hazards.
5. Make sure all the power tools should be inspected by UNITED and inspection sticker
on it.
5. Use proper PPE.
C4
8. Installing cable Trays/conduits &
Tubes, conduit threading &
Bending, Drilling and knock out.
1 / 7 100%
La catégorie de ce document est-elle correcte?
Merci pour votre participation!

Faire une suggestion

Avez-vous trouvé des erreurs dans linterface ou les textes ? Ou savez-vous comment améliorer linterface utilisateur de StudyLib ? Nhésitez pas à envoyer vos suggestions. Cest très important pour nous !