Formal Risk Assessment and Job Safety Analysis
Activity/Task Title: Electrical and Instrunmentation work (Cable Pulling, Terminations, Piping Modification,Cable tray work,Support welding )
Plant and Department: U&O
Project Title: To install C20+ truck loading facility in united U&O
Lifting and positining of Cable drum & cable stand.
Installation of new breaker in substation & Cable termination and Card installation,DCS Configuration in RIB.
Mobilization (Cable Materials, cable drum and Equipment’s by using crane,focklift,boom truck & dump truck)
Termination of power & control cables in control panels & JB’s and in RIB.
1. Mobilization (Cable Materials,
cable drum and Equipment’s by
using crane,focklift,boom truck &
drum truck)
Dismantling & removal of existing Panels JB’s and conduits & installation of new JB's,transformers and heat tracing equipments.
Cable splicing, cad welding, Heat shrinking by Heat gun or gas torch.
Cable lugging and termination.
Installing cable Trays/conduits & Tubes, threading and bending, Drilling and knock out.
1. Ensure to comply with SHEM-08.06 lifting procedure. Enroute area shall be inspected
prior to mobilizing (unsafe ground condition).
2. Ensure to obtain a vehicle entry certificate, approved basic/critical lifting certificate
(SHEM 08.06) and work permit for crane lifting ,Boom truck & forklift activity prior to
entry into the job site.
3. Ensure proper distance between equipment (congested area, other activities).
4. Follow the UNITED traffic rules and regulations.
5. Follow equipment route map as per vehicle movement certificate.
6. Conduct gas test to ensure 0% LEL.
2.Damage to the vehicles, plant facilities
and equipment.
1. Un-inspected, uncertified rigging tools
and tackles Crane / incompetent
personnel that could lead to personal
injury.
1.Obtain valid work permit and vehicle entry certificate for the task.
2. Ensure that Crane,Forklift & truck must be inspected by UNITED mobile equipment &
must have a valid inspection sticker.
3. Only UNITED authorized crane & forklift operator, riggers, flag man (rigger) are
allowed to perform their job.
4. All lifting tools and tackles should be inspected and current color coded by UNITED
mobile equipment.
1. Fall of suspended load that could lead
to property damage and personal injury.
1. Gas test shall be conducted to ensure 0% LEL.
2. Combustible/flammable materials should be removed from the area.
3. While refueling vehicle engine should be shut down, no Hot work activity shall be
allowed nearby area.
4. Cover all sewer lines by using fire blanket on the radius of 3 meters.
5. Fire extinguisher should be placed near the crane.
6. Grounding cable should be connected at proper grounding point.
3. Heat coming from Internal
combustible engine that could cause fire.
1. Lifting area should be barricaded with proper sign board. No personnel are allowed
to walk, stand or work under suspended load. Rigging Supervisor shall conduct tool box
talk to workers and explain jsa/work permit.
2. Rigger should be visible to the crane operator/enough riggers should be provided.
3. Lifting tools and tackles shall be verified by authorized rigger. Softners shall be
provided for slings wound around sharp edges.
4. Only authorized person by riggers shall be allowed to enter inside the barricaded
area.
5. Lifting shall be performed as per approved lifting certificate.
6. Proper planning and supervision by related supervisor at all the time.
2. Lifting and positining of Cable
drum & cable stand.
Cable Meggering and Instrument loop checking.