SUBSTATION OVERVIEW
-B. Prasad
Chartered Engineer
[email protected]
TYPE OF SUBSTATION



Classification based on voltage levels, e.g. : A.C.
Substation : EHV, HV, MV, LV; HVDC Substation.
Classification based on Outdoor or Indoor : Outdoor
substation is under open sky. Indoor substation is
inside a building.
Classification based on configuration, e.g. :
 Conventional air insulated outdoor substation or
 SF6 Gas Insulated Substation (GIS)
 Composite substations having combination of the
above two
Classification based on application
Step Up Substation : Associated with generating station as
the generating voltage is low.
 Primary Grid Substation : Created at suitable load centre
along Primary transmission lines.
 Secondary Substation : Along Secondary Transmission Line.
 Distribution Substation : Created where the transmission line
voltage is Step Down to supply voltage.
 Bulk supply and industrial substation : Similar to distribution
sub-station but created separately for each consumer.
 Mining Substation precaution for safety needed in the
operation of electric supply.
 Mobile Substation: Temporary requirement

PROMARY/SECONDARY/DISTRIBUTION
SUBSTATION



Primary Substations receive power from EHV
lines at 400KV, 220KV, 132KV and transform the
voltage to 66KV, 33KV or 22KV (22KV is
uncommon) to suit the local requirements in
respect of both load and distance of ultimate
consumers. These are also referred to ‘EHV’
Substations.
Secondary Substations receive power at 66/33KV
which is stepped down usually to 11KV.
Distribution Substations receive power at 11KV,
6.6 KV and step down to a volt suitable for LV
distribution purposes, normally at 415 volts
SUBSTATION PARTSAND EQUIPMENTS

Outdoor Switchyard






Incoming Lines
Outgoing Lines
Bus bar
Transformers
Bus post insulator & string insulators
Substation Equipment such as Circuitbeakers, Isolators, Earthing Switches, Surge
Arresters, CTs, VTs, Neutral Grounding
equipment.
SUBSTATION PARTS
….CONTD…








Station Earthing system comprising ground mat, risers,
auxiliary mat, earthing strips, earthing spikes & earth
electrodes.
Overhead earth wire shielding against lightening strokes.
Galvanised steel structures for towers, gantries, equipment
supports.
PLCC equipment including line trap, tuning unit, coupling
capacitor, etc.
Power cables
Control cables for protection and control
Roads, Railway track, cable trenches
Station illumination system
SINGLE LINE DIAGRAM
Transformer part
Batteries for industrial or substation applications



Vented /
Flooded Lead
Acid batteries
Sealed
maintenance
free
batteries/Valve
Regulated Lead
Acid
Nickel Cadmium
(Ni-cd) batteries
Battery AH







LOAD CURRENT 10A for
3 hrs.
Cell voltage =12V DC
CALCULATION ,
AH=10X3
CAPACITY =30/
(0.75X0.8)=50AH
Discharge factor=0.7
Ageing factor =0.8
Drain capacity =C10
CHARGER









Type of charger
Input voltage
output voltage
Application
Protection
Metering
Indication
Alarms
Auto operation
Clearance around an Indoor electrical panel
(NES 110.26)
Description of Clearance
Distance (min)
Left to Right the minimum clearance
0.9 Meter (3 Ft)
Distance between Panel and wall
1.0 Meter
Distance between Panel and Ceiling
0.9 Meter
Clear Height in front of Panel >480V
2.0 Meter
Clear Height in front of Panel <480V
0.9 Meter (3 Ft)
Clearance When Facing Other Electrical
Panels <480V
0.9 Meter (3 Ft)
The width of the working space in front of The width of Panel or 0.762 Meter which is
the Panel
Greater.
Headroom of working spaces for panel
boards (Up to 200Amp)
Up to 2 Meter
Clearance between Bare Metal Busbar in
Panel (NES 408.5)
Voltage
Opposite
Opposite
Polarity
Polarity Live Parts to
Mounted on
Where Held
Ground
Same
Free in Air
Surface
Up to 125 V
19.1 mm
12.7 mm
12.7 mm
125 V to 250 V
31.8 mm
19.1 mm
12.7 mm
250 V to 600 V
50.8 mm
25.4 mm
25.4 mm
Clearance of Outdoor electrical panel to
Fence/Wall (NES 110.31)
Voltage
Distance (min)
600 V to 13.8 KV
3.05 Meter
13.8 KV to 230 KV
4.57 Meter
Above 230 KV
5.49 Meter
GROUND CLEARANCE
VOLTAGE LEVEL MINIMUM GROUND CLEARANCE
less than 66kV
6.1m
66kV - 110kV
6.4m
110kV - 165kV
6.7m
greater than 165kV
7.0m
Earth resistance value









Major power station= 0.5
Ohm.
Major Sub-stations= 1.0
Ohm
Minor Sub-station = 2 Ohm
Neutral Bushing. =2 Ohm
Service connection = 4
Ohm
Medium Voltage Network
=2 Ohm
L.T.Lightening Arrestor= 4
Ohm
L.T.Pole= 5 Ohm
Measurement of Earth Resistance
(Three point method)
Size of earth wire for motor
Sr.
Capacity
Size of earth wire
Size Of Earth Electrode
Cu
Cu
GI
GI
1
01- 10 HP
8 SWG 8 SWG
60cmX60cmX3.18 60cmX60c
mm
mX6.35mm
2
10 – 15 HP
8 SWG 6 SWG
60cmX60cmX3.18 60cmX60c
mm
mX6.35mm
3
15 – 30 HP
6 SWG 4SWG
60cmX60cmX3.18 90cmX90c
mm
mX6.35mm
4
30 – 50 HP
4SWG
25mmX3 mm 90cmX90cmX6.35 90cmX90c
mm
mX6.35mm
IR Value of Submersible Motor
IR Value of Submersible Motor
Motor Out off Well (Without Cable)
IR Value
New Motor
20 MΩ
A used motor which can be reinstalled
10 MΩ
Motor Installed in Well (With Cable)
New Motor
2 MΩ
A used motor which can be reinstalled
0.5 MΩ
IR Value of Transformers:
Voltage
Test Voltage
(DC) LV side
Test Voltage Min IR
(DC) HV side Value
415V
500V
2.5KV
100MΩ
Up to 6.6KV
500V
2.5KV
200MΩ
6.6KV to 11KV
500V
2.5KV
400MΩ
11KV to 33KV
1000V
5KV
500MΩ
33KV to 66KV
1000V
5KV
600MΩ
66KV to 132KV
1000V
5KV
600MΩ
132KV to 220KV
1000V
5KV
650MΩ
Standard voltage
Type
Voltage
EXTRA LOW
VOLTAGE
Up to 50V AC/DC
LOW VOLTAGE
50-1000V AC/DC
MEDIUM VOLTAGE
ABOVE 1000V AC/DC UPTO 6.6KV
AC
HIGH VOLTAGE
ABOVE 6.6KV AC TO 33 KV AC
EXTRA HIGH
VOLTAGE
ABOVE 33KV AC TO 400 KV AC
ULTRA HIGH
VOLTAGE
ABOVE 400 KV AC TO 765 KV AC
Cable end termination
Breaker ACB/VCB/SF6/OCB
EARTHING











The following steps, when put into practice, will ensure a
re lia ble , s a fe and tro uble -fre e s ubs ta tio n g ro und ing
s y s te m :
Size conductors for anticipated faults
Use the right connections
Ground rod selection
Soil preparation
Grounding using building foundations
Grounding the substation fence
Special attention to operating points
Surge arrestors must be grounded properly
Grounding of cable trays
Temporary grounding of normally energized parts
Earthing .....contd
Cabling





Depth of the trench 7 5 0
m m fo r c a ble s up to
1 . 1 KV
Depth of the trench
1 2 0 0 m m fo r c a ble s up
to 1 . 1 KV
Sa nd - covered with 150
mm
Width of the trench 350 mm minimum
Loop –approximate -3
Cable laying





Laying direct in ground
In pipes,
Closed or Open ducts,
Cable trays and
On surface of wall
BUILDING







Administrative building
Conference room etc.
Battery Room
Operator room
Check and change room
Adjacent maintenance room
ECC room
Switchgear and Control Panel Building
Low voltage AC. Switchgear
 High voltage AC. Switchgear
 Control Panels, Protection
Panels
 Capacitor panel room

Mechanical, Electrical and Other Auxiliaries



Fire fighting system
D.G. Set
Oil purification system
ACT FAST AND INITIATE
FIRST
बड़ा सोचो
 तेजी से सोचो व
 सबसे पहले सोचो
 िवचारो पर िकसी का
 एकािधकार नही होता.
----धीरभाई अमबानी

THANK YOU