Inspection and Test Notification (ITN)
Project Name : TIZERT COPPER PROJECT
N° du projet: SP0904
Plant :
ITN No. :
Notification‐SENET‐GC‐51
Date :
09/02/24
CIG
No.
Autre
ITP No./ Item No. Description of inspection
Topo-Inspection
Formwork &anchorbolts
- OXIDE
FLOTATION
B1-2 & B1-3
For plinths(P1)
and (P2)
Inspection for Rebar
- Crushed ore
stockpile
tunnel
Apply the SIKA GROUT
for rock anchors
- TAILINGS
THICKENER B5
Excavation
1
Location
REBAR
Cleaning
- Room Stckpile
Tunnel
Formwork
- Oxide
Flotation
Leane
concrete
- OxideFlotation
Name
10/02/2024
11H00
O9/02/2024
10H00
-TAILINGS
THICKENER
FOUNDATIONS
- TAILINGS
THICKENER
FOUNDATIONS
- Crushed ore
stockpile tunnel
ITP-SEAM-CIG-00
Date & Time
Date
Signature
Remark
Aass Radouane
Prepared by SEAM CQS:
Reviewed by SEAM Const.:
Tarik Ait menzar
09/02/2024
09/02/2024
Reviewed by SENET Const.:
Received by Managem QA/QC:
Inspection Result :
Accepted
Report :
Not Accepted
Re-scheduled
Date/Time:
Remarks :