ITN-CIG-SEAM.51

Telechargé par Anass radouane
Project Name : TIZERT COPPER PROJECT ITN No. :
N° du projet: SP0904
Plant : Date :
CIG Autre
No. Remark
Signature
Name
Date
ITP No./ Item No.
Description of inspection
Location
Date & Time
1
ITP-SEAM-CIG-00
10/02/2024
11H00
O9/02/2024
10H00
Topo-Inspection
Formwork &anchorbolts
Inspection for Rebar
Apply the SIKA GROUT
for rock anchors
Excavation
-
OXIDE
FLOTATION
B1-2 & B1-3
For
plinths(P1)
and (P2)
- Crushed ore
stockpile
tunnel
- TAILINGS
THICKENER B5
-TAILINGS
THICKENER
FOUNDATIONS
- TAILINGS
THICKENER
FOUNDATIONS
- Crushed ore
stockpile tunnel
REBAR
Cleaning
Formwork
-
Room Stckpile
Tunnel
-
Oxide
Flotation
-
OxideFlotation
Leane
concrete
Notification‐SENET‐GC‐51
09/02/24
Prepared by SEAM CQS:
Reviewed by SEAM Const.: Tarik Ait menzar
Reviewed by SENET Const.:
Received by Managem QA/QC:
Inspection Result :
Remarks :
Accepted
Report :
Not Accepted
Re-scheduled
Date/Time:
Aass Radouane
09/02/2024
09/02/2024
1 / 2 100%

ITN-CIG-SEAM.51

Telechargé par Anass radouane
La catégorie de ce document est-elle correcte?
Merci pour votre participation!

Faire une suggestion

Avez-vous trouvé des erreurs dans linterface ou les textes ? Ou savez-vous comment améliorer linterface utilisateur de StudyLib ? Nhésitez pas à envoyer vos suggestions. Cest très important pour nous !