Client: Eurl bio net environment Country: Algeria Date: 13.04.2022 Technical and commercial offer for the complex of thermal neutralization and waste disposal of the HURIKAN 300 Table of Content 1. Inputs from the Client .......................................................................................................................................................................................................... 2 2. Calculations on the thermal utilization and disposal of waste............................................................................................................................................. 3 3. HURIKAN Series Overview .................................................................................................................................................................................................... 4 4. HURIKAN Series Operation Description................................................................................................................................................................................ 5 5. HURIKAN Series Advantages................................................................................................................................................................................................. 7 6. HURIKAN 300 Components .................................................................................................................................................................................................. 8 7. Specifications of HURIKAN 300............................................................................................................................................................................................. 9 8. Commercial Offer ............................................................................................................................................................................................................... 10 9. 8.1. Main Offer .................................................................................................................................................................................................................. 10 8.2. Optional Items............................................................................................................................................................................................................ 10 8.3. Spare parts table ........................................................................................................................................................................................................ 11 8.4. Payment terms ........................................................................................................................................................................................................... 12 8.5. Production time ......................................................................................................................................................................................................... 12 Why Eco-Spectrum ............................................................................................................................................................................................................. 13 General Notes: 1. This proposal is valid for one month form its date; inflation rates may apply at any time as per actual. 2. Eco-Spectrum LLC has the right to change technical data provided in this proposal. 3. Information provided in this proposal is generic and indicative, given at an initial stage for client’s orientation. The sizes, masses and all numbers might change during production. 1 April 13, 2022 19 августа 2021 г. 1. Inputs from the Client Request is made for medical waste incinerator for medical waste in the industrial zone (no gas cleaning system required). The client is an operator for waste collection. Planned incineration rate is between 50-100 kg/hr Working hours is 8 hours a day 2 April 13, 2022 19 августа 2021 г. 2. Calculations on the thermal utilization and disposal of waste Calculations were carried out for the waste proposed in section 1 in addition to presenting characteristics of plastic waste and biological waste to cover a wide range of waste that can be classified as medical. Installation type M, % А, % Q, kcal/kg α T (SCH) °C V (SCH)., м3 Burning rate, kg/h Fuel consumption kg/h ( max) With fuel Fuel free methane diesel 162 234 19,6 22,7 - 24,2 28,1 Medical waste НURIKAN 300 23,9 10,9 3365 1,9 950 5,22 НURIKAN 300 56 Biological waste 12,8 1506 1,9 950 5,22 240 50% Medical waste + 50% Biological waste НURIKAN 300 40 11,8 НURIKAN 300 8 10,6 2435 6202 1,9 950 5,22 192 291 21,5 25 Contaminated Plastic 1,9 950 5,22 97 134 17,3 20,1 *Note: these numbers may vary depending on actual V (SCH)., м3 : Volume of secondary chamber м3 T (SCH) °C: Temperature of secondary chamber °C Q: specific heat of combustion of waste M: Moisture content A: Ash content α: excess air ratio (required excess amount of air to complete the burning process 3 April 13, 2022 19 августа 2021 г. 3. HURIKAN Series Overview 1. HURIKAN is a multi-functional incinerator that is certified to be used for 4700 types of waste, including medical, pharmaceutical, biological and industrial waste. 2. HURIKAN works at a temperature of 850 to 1300 °C, due to which complete disposal of waste is guaranteed. 3. Air emission thresholds for waste incineration facilities are equivalent to Directive 2010/75/EC of the European Parliament and of the Council of 24 November 2010 on industrial emissions. 4. HURIKAN can be mounted on a semi-trailer, highly maneuverable, quickly deployed in place, has a sturdy construction, automatic combustion cycles. 4 April 13, 2022 19 августа 2021 г. 4. HURIKAN Series Operation Description HURIKAN is designed for high-temperature thermal destruction, neutralization and disposal of production and municipal waste, medical and biological. - Main chamber (combustion chamber). The main chamber is a welded box-type structure made of steel sheet, reinforced with metal profile. The lining of the chamber is represented by two layers: the first (main) heat-resistant concrete with an aluminum oxide content of at least 40% and an operating temperature of up to 1400 ° C, perceives the first thermal load and main mechanical load; the second (intermediate) - refractory ceramic fiberboard with an operating temperature of up to 1260 ° C, additionally protects the metal body from high temperatures, which also prevents metal from damage in case of damage to the concrete lining. Burners are installed in two rows. The upper row of the burners provides ignition, combustion of waste, and also maintains the neutralization temperature in automatic mode in a given temperature range. The lower row of burners provides ignition of waste, minimizes mechanical underburn, provides neutralization of liquid waste, and also maintains the neutralization temperature in automatic mode in a given temperature range. Combined lining of the combustion chamber consisting of insulating ceramic and a monolithic refractory concrete layer (unlike brick linings) ensures the absence of technological gaps at the abutment points, which guarantees a long service life without 5 April 13, 2022 19 августа 2021 г. repairs and maintenance. Due to the ceramic plate, heat is stored in the chamber, which significantly saves fuel consumption and prevents heating of the outside body. - Sliding cover. Opening the lid can be carried out in automatic or manual mode. The cover is equipped with an extreme position sensor to turn off the burning device at the time of opening. The lining of the lid is made with high-temperature thermal insulation blankets, which reduces the heat loss of the chamber and reduces the weight of the structure. - Secondary chamber. This chamber is a welded box-type structure made of steel sheet with metal profile. The lining of the chamber is made with high-temperature thermal insulation blankets, which reduces the heat loss of the chamber and reduces the weight of the structure. The design of the chamber ensures the stay of combustion products for at least 2 seconds with an excess of oxygen of at least 6%, which allows to achieve a minimum residual amount or complete destruction - HCN, NH3, formaldehyde, suspended solids and other products of incomplete combustion of waste. Burners of the secondary chamber maintain the afterburning temperature in automatic mode at a given temperature range. Additionally, higher productivity can be achieved due to the “hearth bar” system, ash can be cleaned without stopping equipment. With such a technical solution, the operation of the plant is possible 24/7. Comfortable waste unloading zone, easy opening of the cover due to lining with lightweight high-resistance refractory materials, arrangement of the control board on the incinerator housing provides efficient and safe operation. 6 April 13, 2022 19 августа 2021 г. 5. HURIKAN Series Advantages We Guarantee Quality; o Each detailed component is assembled by our professionals. o Use of hand-made lining. o We use only high-quality insulation material. o Our team is trained to achieve best quality welds o Using durable concrete insures long life span for a frequently movable equipment. o Our in-house design and assembly team is always reachable for easy service/ aftersales guidance at anytime. We provide Cost Saving solutions; o Our design combination of metal-insulationconcrete provides minimum loss for the temperature inside the incinerator, while keeping the outside surface at around 60 C. o By preserving the inside temperature levels, HURIKAN fuel consumption becomes less than other incinerators. It is Eco-Friendly and Safe o Outside temperature stays at around 60 C maximum which ensures operators safety. o Emission levels equivalent to European standards (with gas cleaning systems in some cases). 7 April 13, 2022 19 августа 2021 г. 6. HURIKAN 300 Components Chimney Inspection Hatch Temperature sensor Main chamber Sliding cover Secondary chamber Grate system Burners Ceramic fiber Ash doors Ceramic plate Heat-resistant concrete Platform Switchboard 8 April 13, 2022 19 августа 2021 г. 7. Specifications of HURIKAN 300 Burning rate (kg/hr) Up to 300 Nominal productivity for waste of colorific value of waste 1968 Kcal/kg and water content of 34.82%. Burning rate on waste combination Please refer to section 2 proposed by Client (kg/hr) Dimensions (LхWхH) (mm) 6100х2800х5600 Weight of incinerator (tons) 11.5 Operating temperatures* Main 850/950 °С Chamber/Secondary Chamber Type of fuel diesel Electrical Consumption (kW)- up to 2 Burner (Main chamber), model, q-ty ECOFLAM-MAX 8 – 2 pieces (or equivalent) ECOFLAM-MAX 20 – 1 piece (or equivalent) Burner (Secondary chamber), model, q- ECOFLAM-MAX 20 – 1 piece (or equivalent) ty 9 April 13, 2022 19 августа 2021 г. 8. Commercial Offer 8.1. Main Offer ITEM HURIKAN 300 Price (USD) 1. Incinerator 2. Warranty period from date of installation 12 months Total 75,000 Included 75,000 Notes: 1. 2. 3. 4. The price includes only the product shown and the 12-month warranty period on the equipment parts. Any other type of services or requirements not mentioned in the above specification will be charged accordingly. We do not guarantee gas emission levels, however, according to actual site test, reagents can be added to achieve levels require by the Client The offer contains only the price of diesel operated burners. Prices mentioned based on EXWorks 2020 Krasnodar, Russia delivery terms The prices above are provided on swift transaction payment basis. For L/C payment terms or bank guarantees or any other fees that will be incurred on different payment terms than swift transaction, will be charged accordingly to the Client 8.2. Optional Items Optional Items HURIKAN 300 Price (USD) 1. Spare parts cost for one year (according to table on 8.3) 5,000 2. Supervision of assembly and Supervision of commissioning (1 personnel for 14 days) 11,200 10 April 13, 2022 19 августа 2021 г. 8.3. Spare parts table SPARE PARTS FOR ONE YEAR ITEM/ DESCRIPTION HURIKAN 300 Number/ Type 1. Burners (Ecoflam or equivalent) 1 MAX 8 and 1 MAX 20 2. Temperature sensor 2 3. Insulation (CerablanketTM) 4 boxes 4. Kit for insulation assembly (studs and staples + assembly 20 kits instructions) 5. Refractory concrete (40 kg bag) 1 bag 6. Concrete mastic 2 kg 7. Concrete grates 15 Nos. 8. Concrete grate molds 2 molds Note: The above are the proposed spare parts for one year, the actual need for the proposed spare parts is potentially less, however, taking into consideration the geographic location of the installation, we recommend the above spare part to be available with the Client in case of an emergency for more than one year ahead. The life-span of the above proposed spare parts may vary, depending on the item. Items will need to be properly stored for durability. 11 April 13, 2022 19 августа 2021 г. 8.4. Payment terms The payment terms are: • • 70% advance payment. 30% upon readiness of installation for shipment. 8.5. Production time The estimated production time is 4 months from the date of advance payment. 12 April 13, 2022 19 августа 2021 г. 9. Why Eco-Spectrum 1. Our main activity is scientific research and production1 2. Eco-Spectrum LLC has been selected as “the industry leader” in 2017 in Russia 3. We are in the market since 21.12.2011 4. Production experience of 10 years 5. Experience in international sales of 4 years 6. We have a growing team of 88 professional; 30% - engineers, chemists, environmental designers, 45% professionally qualified master welders, etc. 15% - management and professional staff. 7. Our current production capacity is 2500 m2 (with an envisioned expansion of 5000 m2 in 2022). 8. Our cycle of production operates on 100% basis 9. International CE and ISO certifications are available for our products 10. We have our own proprietary patents Technical and commercial proposal prepared by: Laila Al-Hashlamoun International Business Manager Mob: +7 928 036 42 90 Email: [email protected] 1 All authentication documents can be provided upon Client’s request 13 April 13, 2022 19 августа 2021 г.