An overview on Assessment of Impact on Environment

Telechargé par Blake Bram
An overview on Assessment of Impact on Environment
The cost to carry out the Environmental Impact Assessment may be truly significant part of
planning as well as designing of cost of development project. Disreputably, cost or the rates
of Environmental Impact Assessment In Sri Lanka are quite difficult to simply predict at
outset of project.
It is complete uncertainty and which is because of initial absence of knowledge and
understanding about environmental conditions of baseline about the site of development.
With the progress of project, site knowledge enhances gradually and also new costs might
emerge though reducing the risks. Specifically, in current climate, there is not any
requirement to have clear understanding about costs and risks of environmental and Traffic
Impact Assessment at early stage during the project.
The initial step for effective cost management is to simply carry out the complete study of
EIA scoping. Moreover, outcome of EIA scoping study must be even clear understanding
about basic site features and likely risks and sensitivities of the environment. It must even
provide clear program about how to address different issues which are well identified in
further assessment of environmental impact.
Following the carefully undertaken study of EIA scoping, uncertainties still is same. Such
specific uncertainties are though much easily manageable. For example, during EIA scoping
study and Traffic Impact Assessment Consultants it was mainly identified that no
significant archaeological features are recorded in wider area all around the site. The next
step which is well proposed is mainly carried out a survey of geophysical site. According to
the outcome of survey done for Solid Waste Management In Sri Lanka there might even be a
requirement for simply carrying out the intrusive investigation in an excavation form.
There are mainly three different kinds of uncertainties which will identify the final cost for
the archaeological work being a part of environmental impact assessment.
- The first one, there is an uncertainty about precise cost that could carry out the survey
of geophysical. Moreover, error margin o should also be comparatively small since it is a
comparatively defined activity.
- Next or second uncertainty mainly relates to the fact that irrespective of the results of
survey, it clearly indicates the requirement of further work. It is mainly an issue of yes or no,
where uncertainty is about a chance which further work.
- Third piece about the uncertainty is to check cost of intrusive investigation which is
also required.
A system which is mainly based on forecasting system of Monte Carlo cost is ideally suitable
to perfectly deal with such type of uncertainties. Such kind of the forecasting system is
specially a complete series of probable project costs together along probability which such
costs will never get exceeded. Hence, employing the combination of demanding EIA scoping
study along with methodology of forecasting are highly effective tools in management of
effective cost of the environmental impact assessments.
Environmental engineering mainly applies in protection, improving as well as maintaining of
environment that we are building around. These services are exclusively designed around
ecosystem.
1 / 2 100%
La catégorie de ce document est-elle correcte?
Merci pour votre participation!

Faire une suggestion

Avez-vous trouvé des erreurs dans linterface ou les textes ? Ou savez-vous comment améliorer linterface utilisateur de StudyLib ? Nhésitez pas à envoyer vos suggestions. Cest très important pour nous !