Shaheen Acoustic’s product page listed the fire classification, the test standard,
and indicated that test certificates were available on request. When I contacted
them, the certificates were sent the same day. No follow-up required.
That last point sounds like a low bar. In practice, across five suppliers over three weeks,
it was the differentiator.
Why fire rating documentation matters more than the rating itself
A supplier claiming a fire rating and a supplier being able to prove a fire rating are two
different things. For a school project, the distinction matters for two reasons.
First, Dubai Civil Defence inspections require material compliance documentation to be
on site and available during the inspection. If a product is installed and the test
certificate cannot be produced, the material is non-compliant regardless of its actual fire
performance. Retrofitting panels after a failed inspection is not a theoretical risk — it
happens, and the cost in time and disruption is significant.
Second, for a school specifically, the facilities manager carries accountability for the
materials specified. A supplier’s verbal assurance that a product “meets fire standards”
is not documentation. If there is ever an incident or an audit, the paper trail is what
matters. I was not going to specify a product for three school spaces based on a website
claim and a follow-up that kept getting deferred.
What the Shaheen Acoustic documentation actually covered
The certificates provided covered:
Fire reaction classification to EN 13501-1, with the specific class clearly stated.
The testing laboratory and date of test — relevant because certificates older than
a certain period are sometimes queried during inspections.
The specific product variant tested, confirming that the certificate applied to the
thickness and facing we were specifying, not a different configuration of the same
product range.
A declaration of performance document that could be submitted as part of the
material approval package to the main contractor.
That last point mattered specifically for our project. The main contractor required
material submittals before installation could begin, and having a complete
documentation package ready on first request meant our submittal went in on time. No
delays waiting for paperwork.
How the installation went
The panels were delivered to programme. The product matched the specification —
dimensions, facing, core density — consistently across the delivery. The installation
team had no material queries during the works, which for a school project on a live site
with strict access windows was important.