55Installation of Solar PV Systems Guidance Document
No Design & Installation Check list Check
9
Ensure solar system access:
a) Ensure location to be mounted will get maximum
exposure to sunlight (aim for South);
b) Ensure location if away from any obstruction and
shaded areas.
c) Ensure adequate space is provided to perform
routine module cleaning.
10
Ensure all PV modules connected to the same inverter
face the same direction or use multiple Maximum
power point tracking (mppt) tracking inverters.
11
Ensure PV modules are mounted at the optimal tilt
angle depending on installation conditions (typically a
tilt angle of between 10° to 20° degrees is
recommended).
12 Ensure sucient ventilation space is allocated behind
the PV array for cooling purposes.
13
Ensure:
a) Cabling used meet sucient current-carrying
capacity and are suitably rated for usage in the
environment.
b) d.c. cables are single-core and double-insulated.
c) Cable insulation on outdoor cables must withstand
high temperature and UV exposure for an estimated
period of more than 20 years.
[Note: PVC and XLPE cables are inadequate on the d.c.
side and must not be exposed to the weather
elements.]
14 Determine if a Lightning Protection System is needed.
Consult a lightning specialist.
15
Ensure that the installation is in full compliance with
the requirements of the latest edition of the Electricity
Wiring Regulations (i.e. General principles, Protection,
Isolation and switching, Labelling, inspection and
testing.