Inspection and Test Notification (ITN)
Project Name : TIZERT COPPER PROJECT
ITN No. :
Notification‐SENET‐GC‐55
du projet:
SP0904
Plant :
Date :
CIG
No.
ITP No./ Item No.
Description of inspection
Location
Date & Time
Remark
1
ITP-SEAM-CIG-00
Topo-Inspection
Formwork & Anchor bolts
And Pouring Concrete
30MPA
Inspection for Rebar
Inspection for Bottom
Apply the SIKA GROUT
for rock anchors
Excavation
REBAR & Formwork
- OXIDE
FLOTATION
B1-4 & B1-3
For plinths(P1)
and (P2)
- (B5-B4-B3-B2) IN
Tailing thickener
- Oxide flotation
B3-B4 & B5
- Tailing Thickener
- Oxide and
Sulphide
Flotation
- Crushed ore
stockpile tunnel
- Tower cantilever
- Room
Stockpile
Tunnel
- Tailing
thickener Axe 4
(B5-B4-B3-B2)
- TAILINGS
THICKENER B5
- Oxide &
Sulphide Flotation
- TAILINGS
THICKENER
FOUNDATIONS
- TAILINGS
THICKENER
FOUNDATIONS
- Crushed ore
stockpile tunnel
- Tower cantilever
-Oxide & Sulphide
Flotation
12/02/2024
09H00
15/02/2024
09H00
Cleaning
Leane concrete
- Room Stockpile
Tunnel
- Rom Escape
stockpile tunnel
- Tailing Thickener
- Oxide Flotation
Name
Date
Prepared by SEAM CQS:
Aass Radouane
14/02/2024
Reviewed by SEAM Const.:
Tarik Ait menzar
14/02/2024
Reviewed by SENET Const.:
Received by Managem QA/QC:
Inspection Result :
Accepted
Report :
Remarks :
Not Accepted
Re-scheduled
Date/Time:
1 / 2 100%

ITN-CIG-SEAM.55

Telechargé par Anass radouane
La catégorie de ce document est-elle correcte?
Merci pour votre participation!

Faire une suggestion

Avez-vous trouvé des erreurs dans linterface ou les textes ? Ou savez-vous comment améliorer linterface utilisateur de StudyLib ? Nhésitez pas à envoyer vos suggestions. Cest très important pour nous !