Interlock Philosophy

Telechargé par KRC Project
Project Name:
Technical Consultancy Services for 20% Ethanol Blending Facilities Project at Reliance
Petro Terminals
Document No.:
Rev.:
0
Project Name:
Technical Consultancy Services for 20% Ethanol Blending Facilities
Project at Reliance Petro Terminals
Client:
Location:
Bhopal
Document No.:
INTERLOCK PHILOSOPHY
0
23-06-2022
Review and Approval
Rev.
Date
Description
Prepared
Reviewed
Approved
Client Review
Project Name:
Technical Consultancy Services for 20% Ethanol Blending Facilities Project at Reliance
Petro Terminals
Document No.:
Rev.:
0
Tank Mode
Status of Automated valves of Tanks
Tank
inlet
MOV
Tank inlet
ROSOV
Tank
Recirculation
Line MOV
Tank
Outlet
MOV
Tank
Outlet
ROSOV
Dormant Mode
C
C
C
C
C
Receipt/Recirculation
Mode
Case-I
O
O
C
C
C
Case-II
O
O
O
C
C
Case-III
O
O
O
C
C
Dispatch Mode
C
C
C
O
O
Project Name:
Technical Consultancy Services for 20% Ethanol Blending Facilities Project at Reliance
Petro Terminals
Document No.:
Rev.:
0
INTERLOCK
NO.
INTERLOCK DESCRIPTION
IZ 001
ESD ACTUATION
ALL PUMPS / ROSOV'S / MOV'S/ BATCH
CONTROLLER SHALL CLOSE/BARRIER
GATE TO OPEN ON ACTUATION OF ESD.
I-001
EARTHING PERMISSIVE
EARTHING TRIP INTERLOCK
FOR START OF UNLOADING PUMP;
FOR STOP OF PUMP DURING RUNNING
CONDITION.
I005B
I005C
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
TANK (MPL801-MT-J37-T501A) INLET
MOV-J37-007A CLOSE
I006B
I006C
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501B)
HIGH HIGH ALARM
TANK (MPL801-MT-J37-T501B) INLET
MOV-J37-007B CLOSE
I003A
I003B
I003C
AT LS-J37-12 OF TANK (MPL801-MT-J37-T501A) HIGH
HIGH HIGH ALARM
OR
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH HIGH ALARM
TANK (MPL801-MT-J37-T501A) INLET
ROSOV-J37-011 CLOSE
I004A
I004B
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501B)
HIGH HIGH HIGH ALARM
TANK (MPL801-MT-J37-T501B) INLET
ROSOV-J37-020 OF CLOSE
Project Name:
Technical Consultancy Services for 20% Ethanol Blending Facilities Project at Reliance
Petro Terminals
Document No.:
Rev.:
0
I015B
I015C
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
BOTH UNLOADING PUMPS MPL801-MP-
J37-P601A/MPL801-MP-J37-P601B TRIP
I016B
I016C
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501B)
HIGH HIGH ALARM
BOTH UNLOADING PUMPS MPL801-MP-
J37-P601A/MPL801-MP-J37-P601B TRIP
I002A
I002B
TANK (MPL801-MT-J37-T501A) INLET MOV IS CLOSE
OR
TANK (MPL801-MT-J37-T501B) INLET MOV IS CLOSE
BOTH UNLOADING PUMPS MPL801-MP-
J37-P601A/MPL801-MP-J37-P601B TRIP
I005B
I005C
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
TANK RECIRCULATION MOV-J37-008
CLOSE
I006B
I006C
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
HIGH HIGH ALARM
TANK RECIRCULATION MOV-J37-008
CLOSE
I007A
I007B
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
LOW LOW ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
LOW LOW ALARM
TANK (MPL801-MT-J37-T501A) OUTLET
MOV-J37-019 CLOSE
I008A
I008B
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501B)
LOW LOW ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501B)
LOW LOW ALARM
TANK (MPL801-MT-J37-T501B) OUTLET
MOV-J37-028 CLOSE
Project Name:
Technical Consultancy Services for 20% Ethanol Blending Facilities Project at Reliance
Petro Terminals
Document No.:
Rev.:
0
I009A
I009B
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
LOW LOW LOW ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
LOW LOW LOW ALARM
TANK (MPL801-MT-J37-T501A) OUTLET
ROSOV-J37-018 CLOSE
I010A
I010B
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501B)
LOW LOW LOW ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501B)
LOW LOW LOW ALARM
TANK (MPL801-MT-J37-T501B) OUTLET
ROSOV-J37-027 CLOSE
I011A
I011B
I011C
TANK (MPL801-MT-J37-T501A) OUTLET MOV IS CLOSE
ALL THREE BLENDING PUMPS MPL801-
MP-J37-P501A/MPL801-MP-J37-P501B/
MPL801-MP-J37-P501C TRIP
I012A
I012B
I012C
TANK (MPL801-MT-J37-T501B) OUTLET MOV IS CLOSE
ALL THREE BLENDING PUMPS MPL801-
MP-J37-P501A/MPL801-MP-J37-P501B/
MPL801-MP-J37-P501C TRIP
I017A
I017B
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501A)
LOW LOW ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501A)
LOW LOW ALARM
ALL THREE BLENDING PUMPS MPL801-
MP-J37-P501A/MPL801-MP-J37-P501B/
MPL801-MP-J37-P501C TRIP
I018A
I018B
AT RADAR GAUGE-1 OF TANK (MPL801-MT-J37-T501B)
LOW LOW ALARM
OR
AT RADAR GAUGE-2 OF TANK (MPL801-MT-J37-T501B)
LOW LOW ALARM
ALL THREE BLENDING PUMPS MPL801-
MP-J37-P501A/MPL801-MP-J37-P501B/
MPL801-MP-J37-P501C TRIP
I013
AT HIGH PREESURE OF DISCHARGE HEADER OF
BLENDING PUMP
ALL THREE BLENDING PUMPS MPL801-
MP-J37-P501A/MPL801-MP-J37-P501B/
MPL801-MP-J37-P501C TRIP
I014
OVERFILL FROM LOADING TRUCK TANKER
XV-043 VALVE IN THE UPSTREAM OF
STRAINER-CUM-AIR ELIMINATOR SHALL
CLOSED BY BCU (FOR BOTTOM LOADING
OPERATION)
1 / 5 100%

Interlock Philosophy

Telechargé par KRC Project
La catégorie de ce document est-elle correcte?
Merci pour votre participation!

Faire une suggestion

Avez-vous trouvé des erreurs dans linterface ou les textes ? Ou savez-vous comment améliorer linterface utilisateur de StudyLib ? Nhésitez pas à envoyer vos suggestions. Cest très important pour nous !