10109-JV0012MR-TMPL801 Rev(0)

Telechargé par KRC Project
Reliance Industries Limited
Project Name: 20% Ethanol Blending Facilities Project at Reliance Petro Terminals
MR No.: 10109-JV0012MR-TMPL801 Rev.:
1
Page 1 of 17
Project Name: 20% Ethanol Blending Facilities Project at Reliance Petro Terminals
Client: Reliance Industries Limited
Location: Bhopal Terminal MR
No.:
10109-JV0012MR-TMPL801
MATERIAL REQUISITION FOR
LIMIT SWITCH OF DYKE VALVE
0 19-09-2022 Review and Approval SSH AP SKJ RIL
Rev. Date Description
Prepared
Reviewed
Approved Client
Reliance Industries Limited
Project Name: 20% Ethanol Blending Facilities Project at Reliance Petro Terminals
MR No.: 10109-JV0012MR-TMPL801 Rev.:
1
Page 2 of 17
TableofContents
Section 1 – Scope of Supply ................................................................................ 3
SECTION 2 – TECHNICAL AND PROCEDURAL REQUIREMENTS .......................................... 6
SECTION 3 – VENDOR DRAWING & DATA REQUIREMENT (VDDR) ..................................... 10
SECTION 4 - QUALITY ASSURANCE REQUIREMENT ..................................................... 14
SECTION 5 – SUPPLIER QUALITY SURVEILLANCE REQUIREMENTS .................................... 15
SECTION 6 – DATASHEETS………………………………………………………………………………………………………….17
Reliance Industries Limited
Project Name: 20% Ethanol Blending Facilities Project at Reliance Petro Terminals
MR No.: 10109-JV0012MR-TMPL801 Rev.:
1
Page 3 of 17
Section 1 – Scope of Supply
1.0 Instructions to SELLER at the Offer Stage:
1.1. SELLER shall submit with his offer, the attached Compliance Statement(s) as per format
mentioned in section 2 of MR duly filled up. The Statement(s) shall be filled and submitted,
irrespective of whether SELLER is complying fully or partially with the requirements of the MRQ.
1.2. SELLER shall furnish all the documents requested to be submitted along with bid (See Section 3).
In case some documents are missing, the bid may not be taken up for review, thus delaying the
Technical Review process. It might happen that the SELLER’s bid may be dropped from
Technical review process without giving information to the SELLER.
1.3. SELLER shall submit the duly signed and stamped Datasheets, after filling in the requested data,
along with the bid. Wherever SELLER does not agree with the data already filled in, SELLER
shall correct it, by crossing it out and writing his figures, in the datasheet itself.
2.0 Requirements to be fulfilled by SELLER:
2.1. SELLER shall check and confirm that the scope specified in Section 1 satisfies the duty
requirements described in the Material Requisition and the referenced documents.
All components which are required for the equipment to function, if not stated in Section 1,
shall be explicitly defined by SELLER and informed to BUYER during offer review. Any missed
out items, if discovered after placement of the purchase order, shall be part of SELLER’s
scope.
2.2. SELLER shall be responsible to comply with all the statutory requirements. In case, any of the
instructions and details in the MR and its attachments contravene any statutory requirements,
SELLER shall bring the same to the notice of BUYER immediately, for resolution.
2.3. SELLER shall be responsible to comply with Design Codes, Datasheets, Specifications and
Design Standards attached to this MR. Any modification/deviation shall be submitted in the
prescribed format FR-ZR-0096.
2.4. The SELLER shall furnish Design Guarantee for all the equipment and parts thereof, where the
design is in SELLER’s scope. The SELLER shall furnish the Material and Workmanship
guarantee for all the equipment and parts thereof, which are in SELLER’s scope of supply.
Reliance Industries Limited
Project Name: 20% Ethanol Blending Facilities Project at Reliance Petro Terminals
MR No.: 10109-JV0012MR-TMPL801 Rev.:
1
Page 4 of 17
Section 1 – Scope of Supply
Item Rev Tag No. Qty. Unit DESCRIPTION WBS
No. Estimate
Price
0.01 0 1 LT
Project Management up to Mechanical Completion,
Design, Engineering, Procurement Services, Material
manufacture / Fabrication, Supply, Inspection,
Testing and Construction Supervision in accordance
with the requisition and its referenced attachments.
OR
1 LT
Design, Engineering, Manufacture, Supply,
Inspection & Testing in accordance with the
requisition and its referenced attachments.
OR
1 LT
Manufacture & Supply of following Materials in
accordance with the requisition and its referenced
attachments.
0.02 0 1 LT
Drawings and data shall be provided by the seller in
accordance with Section 3, Vendor Drawing & Data
Requirement (VDDR). The seller shall comply with
the requirements set out in VDDR, Supplier
Documents - Instructions and Contents.
0.03 0 1 LT
Vendor Drawing & Delivery Schedule (VDDS)
(Document Category/No. A01) completed in
accordance with the requirements stated in Section
3 detailing:
* Drawings and data required to enable REG design
to proceed.
* Drawings and data required for field construction
purposes and client information and record systems
(fully indexed, bound volumes)
- material and /or sub assembly acquisition
- fabrication and/or labor
- final assembly, testing shipping
0.04 0 1 LT Packing and Bracing
0.05 0 1 LT Carry out Testing and Inspection as ITP
0.06 0 1 LT Spares for Two years of Operation
1.0 0
TMPL801-JV-J37-6001
A/B 1 EA
Limit Switch
Data sheet No. - 10109-JV0012D-TMPL801-401
2.0 0
TMPL801-JV-J37-6002 1 EA
Limit Switch
Data sheet No. - 10109-JV0012D-TMPL801-401
3.0 0
TMPL801-JV-J37-6003 1 EA
Limit Switch
Data sheet No. - 10109-JV0012D-TMPL801-401
Reliance Industries Limited
Project Name: 20% Ethanol Blending Facilities Project at Reliance Petro Terminals
MR No.: 10109-JV0012MR-TMPL801 Rev.:
1
Page 5 of 17
ENGG NOTES:
1. NDE casting and material certification shall be in accordance with piping material
specification.
2. Seller shall furnish fitting, mounting brackets necessary to make the assembly functional and
provide a completely assembled operable unit.
1 / 346 100%

10109-JV0012MR-TMPL801 Rev(0)

Telechargé par KRC Project
La catégorie de ce document est-elle correcte?
Merci pour votre participation!

Faire une suggestion

Avez-vous trouvé des erreurs dans linterface ou les textes ? Ou savez-vous comment améliorer linterface utilisateur de StudyLib ? Nhésitez pas à envoyer vos suggestions. Cest très important pour nous !